Futures
Access hundreds of perpetual contracts
TradFi
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Pre-IPOs
Unlock full access to global stock IPOs
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
Apparently Nvidia has quietly visited Korean power equipment companies, asking them to redesign data center infrastructure around 800V DC architecture.
That's an admission the centralized AI model has hit a physical wall, every new chip generation now drags a fresh substation retrofit somewhere in the stack.
Global data centers already run at 12 to 18 percent utilization. Crypto mining farms have powerful GPUs sitting idle since the Ethereum merge. Consumer gaming rigs with 4090s sit unused on desks all day.
The compute shortage is a distribution problem masked as physics. You cannot retrofit your way out when demand doubles every 3.4 months.