Trina Te: Launches “SuanDian Island” Computing-Power Power Supply Station for Computing Power Centers, Reducing Token Costs by 30%

Tritida has launched a computing power center high-voltage AC/DC prefabricated power station “Computing Power Island,” reshaping the underlying power-supply architecture of intelligent computing centers. With a modular prefabricated design from the equipment factory, it can connect directly to 110/220kV high voltage and provide 800V DC direct supply to the data center’s machine rooms. The construction period is reduced to 150 days. Relying on silicon carbide SST technology, power-supply efficiency reaches 98.5%. Relying on the computing power co-ordination AI platform to optimize dispatch, Token electricity costs decrease by about 30%. With 800V busbars directly connected to energy storage, it enables 100% local utilization of green electricity. Integrated solutions reduce the project’s total comprehensive cost by 20% and lower operating and maintenance costs by 40%. (Cailian Press)
TOKEN-5.77%
View Original
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • Comment
  • Repost
  • Share
Comment
Add a comment
Add a comment
No comments