Futures
Access hundreds of perpetual contracts
TradFi
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Pre-IPOs
Unlock full access to global stock IPOs
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
Progress bar refreshed! The first contact wire line successfully installed on the Nanzhu High-Speed Rail Yucen section.
Today (April 23), the first contact wire line for the Yuzhen section of the Nanzhu High-Speed Rail was successfully installed between the northern Yulin in Guangxi and the Nanzhou area of Rong County, marking the full entry of the station’s “Four Electric” engineering into the contact wire installation phase. The project has entered a critical sprint period. The contact wire line installed this time is 1,338 meters long and is a core component of the electrified railway traction power supply system, serving as the “artery” delivering electricity to the train. The installation accuracy and quality directly determine the safety and stability of train operation. (CCTV News)