The domestically produced large cruise ship "Ida Huacheng" has begun docking.

Today (the 20th) in the afternoon, the second domestically produced large cruise ship, “Aida Huacheng,” was launched from the dry dock. After launching, “Aida Huacheng” will enter the dock construction and commissioning phase, preparing for the test voyage at the end of May. “Aida Huacheng” has a total tonnage of over 140k tons, a length of 341 meters, a width of 37.2 meters, and a total of 2,130 rooms, capable of accommodating more than 5,200 passengers. (CCTV News)

View Original
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • Comment
  • Repost
  • Share
Comment
Add a comment
Add a comment
No comments
  • Pin