Futures
Access hundreds of perpetual contracts
TradFi
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Launchpad
Be early to the next big token project
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
Kazakhstan's Silleno Partners With German Firm For Logistics Complex In Atyrau
(MENAFN- Trend News Agency) ** ASTANA, Kazakhstan, March 31**. Silleno LLP, operator of the polyethylene production project in the Atyrau region of Kazakhstan, and Karl Schmidt Spedition GmbH & Co (KSS) have signed an EPC contract for the construction of a logistics complex, Trend reports via the company.
The project will support the development of one of the largest logistics complexes in Kazakhstan’s oil and gas sector, with KSS responsible.
The proposed logistics complex is designed to manage up to 1.25 million tons of polyethylene pellets annually. This includes comprehensive functions such as packaging, storage, and shipment to both domestic and export markets through rail and road transportation.
The complex will feature 11 distinct facilities, including storage silos, a primary packaging and palletizing building, warehouses for finished products and materials, shipping zones, an administrative and operations building with a control room, a container terminal, a container repair workshop, open storage areas, and a transformer substation.
The project is scheduled for completion and commissioning by the end of 2028. It will also integrate advanced digital solutions to enhance automation and optimize logistics efficiency.
The polyethylene plant is being developed within the Karabatan industrial zone, part of the National Industrial Petrochemical Technopark Special Economic Zone in Atyrau. Production is expected to commence in 2029. The project entered its active construction phase on March 31, 2025, marked by the commencement of pile driving for the pyrolysis unit.
With a planned capacity of 1.25 million tons per year and total investments exceeding $7 billion, the Silleno project is expected to become one of the largest industrial projects in Kazakhstan’s manufacturing sector.
Karl Schmidt Spedition GmbH & Co (SCHMIDT Group) is an international dry bulk logistics operator with more than 75 years of experience, operating across 49 sites worldwide with over 1,300 vehicles and 7,000 containers.
MENAFN31032026000187011040ID1110924077