Futures
Access hundreds of perpetual contracts
CFD
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
CFD
Stock CFD Derivatives
US Stocks
Access real US stocks and ETFs
HK Stocks
Trade quality Hong Kong-listed stocks
Korean Stocks
SK Hynix
Real Korean stocks and top assets
Stock Futures
High leverage, 24/7 trading
Tokenized Stocks
Backed by real stock assets
IPO Access
Unlock full access to global stock IPOs
GUSD
3.8%
Mint GUSD for Treasury RWA yields
Stocks Activities
Trade Popular Stocks and Unlock Generous Airdrops
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Pre-IPOs
Unlock full access to global stock IPOs
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
Promotions
AI
Gate AI
Your all-in-one conversational AI partner
Gate AI Bot
Use Gate AI directly in your social App
GateClaw
Gate Blue Lobster, ready to go
Gate for AI Agent
AI infrastructure, Gate MCP, Skills, and CLI
Gate Skills Hub
10K+ Skills
From office tasks to trading, the all-in-one skill hub makes AI even more useful.
The copper supply gap threatens AI data centers and the momentum of global electrification
Source: Yellow Original Title: The Copper Supply Gap Threatens AI Data Centers and Global Electrification Drive
Original Link: https://yellow.com/es/news/la-brecha-en-el-suministro-de-cobre-amenaza-los-centros-de-datos-de-ia-y-el-impulso-de-electrificacion-global According to Katusa Research, copper is becoming a decisive constraint for global AI infrastructure, electrification, and defense system deployment. The analysis warns that demand growth is outpacing supply capacity.
Citing S&P Global's January 2026 copper outlook report, Katusa Research notes that global copper demand is expected to increase from approximately 28 million metric tons currently to 42 million metric tons by 2040.
Without significant intervention, the company estimates the market faces a potential deficit of about 10 million metric tons, a gap described as structurally unmanageable under the current supply timetable.
This month, copper prices hit a daily record close to $6 per pound, with Katusa Research stating this reflects that global inventory buffers are nearly exhausted.
AI and Electrical Infrastructure Drive Demand
Katusa Research points out that AI-driven power consumption is a key accelerant.
According to data cited from S&P Global in the report, US data centers accounted for about 5% of electricity demand when ChatGPT was launched at the end of 2022. This proportion is expected to rise to 14% by 2030.
Each megawatt of AI data center capacity requires 30 to 47 metric tons of copper for wiring, cooling systems, and power distribution.
In China, AI facilities are typically built with double redundancy, requiring even higher copper intensity.
The report mentions that J.P. Morgan estimates that just AI data centers could add approximately 110,000 metric tons of incremental copper demand by 2026.
Electric Vehicles and Defense Increase Inelastic Pressure
Electrification of transportation amplifies this pressure.
The report states that copper used in battery electric vehicles is nearly three times that of internal combustion engine vehicles, with global copper demand related to EVs expected to grow from about 2.6 million metric tons today to 6.3 million metric tons annually by 2040.
Increased defense spending adds another layer of inelastic demand.
NATO member countries have committed to higher military budgets, and modern weapon systems, communication infrastructure, and drones are all copper-intensive, the company notes.
Insufficient Supply Growth Rate
On the supply side, the report emphasizes declining ore grades, operational disruptions, and permitting delays.
S&P Global data shows that it takes an average of 17 years to bring a new copper mine from discovery to first production.
The UBS forecast cited by the company indicates that the copper deficit will expand from about 230,000 metric tons in 2025 to over 400,000 metric tons in 2026, with inventories already depleted.
"The world needs 50% more copper," Katusa Research states, "supply channels simply cannot respond in time."