Phase One done



Now comes the compounding part

@helios_layer1 is executing through sequencing, and the order tells the story:

+ Early airdrop establishes distribution and aligns the core user base
+ Builder grants activate ahead of mainnet, allowing infrastructure and apps to ship before demand accelerates
+ Mainnet arrives in Q1 ’26 with both supply and demand already live, tested, and active onchain

This follows a staggered L1 launch model:

Phase One → social graph + wallet graph
Phase Two → developer graph + product graph
Mainnet → liquidity and narrative converge

The grants phase sets the foundation

It determines which ecosystems gain momentum before the expansion phase
post-image
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • Comment
  • Repost
  • Share
Comment
0/400
No comments
Trade Crypto Anywhere Anytime
qrCode
Scan to download Gate App
Community
English
  • بالعربية
  • Português (Brasil)
  • 简体中文
  • English
  • Español
  • Français (Afrique)
  • Bahasa Indonesia
  • 日本語
  • Português (Portugal)
  • Русский
  • 繁體中文
  • Українська
  • Tiếng Việt