Dasar
Spot
Perdagangkan kripto dengan bebas
Perdagangan Margin
Perbesar keuntungan Anda dengan leverage
Konversi & Investasi Otomatis
0 Fees
Perdagangkan dalam ukuran berapa pun tanpa biaya dan tanpa slippage
ETF
Dapatkan eksposur ke posisi leverage dengan mudah
Perdagangan Pre-Market
Perdagangkan token baru sebelum listing
Futures
Akses ribuan kontrak perpetual
TradFi
Emas
Satu platform aset tradisional global
Opsi
Hot
Perdagangkan Opsi Vanilla ala Eropa
Akun Terpadu
Memaksimalkan efisiensi modal Anda
Perdagangan Demo
Pengantar tentang Perdagangan Futures
Bersiap untuk perdagangan futures Anda
Acara Futures
Gabung acara & dapatkan hadiah
Perdagangan Demo
Gunakan dana virtual untuk merasakan perdagangan bebas risiko
Peluncuran
CandyDrop
Koleksi permen untuk mendapatkan airdrop
Launchpool
Staking cepat, dapatkan token baru yang potensial
HODLer Airdrop
Pegang GT dan dapatkan airdrop besar secara gratis
Pre-IPOs
Buka akses penuh ke IPO saham global
Poin Alpha
Perdagangkan aset on-chain, raih airdrop
Poin Futures
Dapatkan poin futures dan klaim hadiah airdrop
Investasi
Simple Earn
Dapatkan bunga dengan token yang menganggur
Investasi Otomatis
Investasi otomatis secara teratur
Investasi Ganda
Keuntungan dari volatilitas pasar
Soft Staking
Dapatkan hadiah dengan staking fleksibel
Pinjaman Kripto
0 Fees
Menjaminkan satu kripto untuk meminjam kripto lainnya
Pusat Peminjaman
Hub Peminjaman Terpadu
Guangguan Power: Total electricity generation in the first quarter reached 11.1B kWh, an increase of 49.05% compared to the same period last year
People’s Financial News 8 April, Guiguan Power (600236) announced that by 31 March 2026, the company’s directly affiliated and holding companies’ power plants had a cumulative power generation of 11.1B kWh in the first quarter of 2026, an increase of 49.05% year-on-year.
The main reasons for the change in the company’s power generation in the first quarter of 2026 compared to the same period last year are:
First, at the beginning of 2026, the water levels of major reservoirs (including Longtan) in the upper reaches of the Hongshui River, the main power generation basin of the company, were relatively high, with more water storage and greater water supply for power generation, resulting in a 30-40% increase compared to the same period last year, and thus a year-on-year growth in power generation;
Second, the company’s new energy installed capacity increased, and new energy power generation increased year-on-year;
Third, due to the annual growth of installed capacity in Guangxi and the increased proportion of new energy installed capacity, the space for thermal power generation was squeezed, and the average utilization hours of thermal power in Guangxi decreased significantly year-on-year.