Guangdong Construction: Dos proyectos de generación de energía fotovoltaica en red en funcionamiento

People Finance News, 1 April: Guangdong Construction Engineering (002060) announced on 1 April 2026 that, as of 31 March 2026, the wholly-owned subsidiary of Guangdong Yue Shui Electric Energy Investment Group Co., Ltd. under the company—Puer Yue Shui Electric Energy Co., Ltd.—invested in and constructed the Wenwu Tea and Solar Complementary Photovoltaic Power Generation Project and the Lao Gengzhai Photovoltaic Power Generation Project, which have entered grid-connected operation. Among them, the Wenwu Tea Solar Complementary Photovoltaic Power Generation Project has a grid-connected capacity of 50MW, and the Lao Gengzhai Photovoltaic Power Generation Project has a grid-connected capacity of 90MW. The grid-connected operation of the above projects will have a certain enhancing effect on the company’s future operating performance. As of now, the company’s cumulative installed and commissioned clean energy power generation projects total an installed capacity of 5553.15MW, including hydropower 380.50MW, wind power 880.36MW, photovoltaic power 3792.29MW, independent energy storage 500MW; and hydrogen production and storage 600Nm³/h.

Ver originales
Esta página puede contener contenido de terceros, que se proporciona únicamente con fines informativos (sin garantías ni declaraciones) y no debe considerarse como un respaldo por parte de Gate a las opiniones expresadas ni como asesoramiento financiero o profesional. Consulte el Descargo de responsabilidad para obtener más detalles.
  • Recompensa
  • Comentar
  • Republicar
  • Compartir
Comentar
Añadir un comentario
Añadir un comentario
Sin comentarios
  • Anclado