According to the Elrond/MultiversX (EGLD) team, an upgrade is scheduled on epoch 970 , estimated on March 27, 2023 at 15:35 UTC. Gate supports this upgrade and will suspend EGLD deposits and withdrawals during the process. Deposits and withdrawals will be resumed as soon as possible after this upgrade. Trading of EGLD will not be affected.
Thank you for your understanding and continued support.
Learn more:
https://multiversx.com/releases/release-mx-chain-go-v1-4-14
Sign up to enter the crypto gateway and get 40% commission from referrals
Download iOS/Android App right now.
Reach out to us!
Twitter: https://twitter.com/gate_io
GateVIP Twitter: https://twitter.com/GateioVIP
Telegram: https://t.me/gate_zh
API Telegram: https://t.me/gateioapi
Instagram: https://www.instagram.com/gateioglobal
Medium: https://gateio.medium.com/
Podcast: https://gateio.buzzsprout.com/?ch=buzzs
Gate Team
March 23, 2023
مشاركة المنشورات


مقالات ذات صلة